About Us
We Build It.
You Run It.
Boreal Core builds AI factory infrastructure in Norway — data center space, power, and facilities — and leases it to partners who run their own AI operations. We provide the foundation; you bring the ambition.



Our Vision
To be Norway's premier AI factory infrastructure provider — building the physical foundation that operators, researchers, and enterprises lease to run their own sovereign AI at scale.
Our Mission
To build and lease world-class AI factory infrastructure — providing data center space, renewable power, and facilities so partners can operate their own AI workloads without building their own facilities.
Our Values
Built on Principles
Sustainability First
100% renewable energy from Norwegian hydroelectric power. Building silent, carbon-neutral AI infrastructure.
Global Impact, Nordic Roots
From Oslo to the world — combining Nordic engineering excellence with global innovation reach.
Sovereign AI
Ensuring European data sovereignty and GDPR compliance for enterprises processing sensitive AI workloads.
Human-Centered AI
Technology built around human values — empowering people through ethical, transparent AI systems.
Our Journey
Milestones
Boreal Core Established
Headquartered in Oslo, Norway with a vision to build and lease AI factory infrastructure powered by clean Nordic energy to operators worldwide.
Stensby Data Center — Building Now
A data center facility in Eidsvoll Minnesund currently under construction. Phase one live at 3.5 MW. Engineered to scale to 303.5 MW for lease partners.
Lease-Based Onboarding
We provide the infrastructure space, power, and facility. Partners lease it to run and operate their own AI factory workloads — they bring the hardware and team.
Education & Collaboration
Building an Omniverse Campus alongside the facility where lease partners and learners collaborate, train, and innovate together on sovereign Nordic soil.
Strategic Nordic Location
Headquartered in Oslo at Kjølberggata 29A, with our data center facility at Stensbyvegen 28, Eidsvoll Minnesund — strategically positioned at the intersection of Norway's renewable energy grid and major connectivity hubs. Just 20 minutes from Oslo Gardermoen Airport, offering unparalleled access for European and global partners.
Modern Facility
Purpose-built for AI
Green Energy
100% hydroelectric

